4fxzne8u4d49ifpqizoqjaajzrpjam
B&W Designer Tile
  • B&W Designer Tile

Things to expect from your new shower remodel.

For B&W Designer Tile, showers are the number one project that we do. A shower tile installation project should last a minimum of 20 years. So, if you've had your shower done and it's failing such as a leaking pan or any aspect is coming apart, in only a few years or less...you should look in to the reason. Any loose tiles or any caulking that is cracking should be addressed immediately. Either one of these problems will develop into a much worse issue. Feel free to give us a call for an inspection if you're not sure how to address something you have any questions about.


Recent Posts

See All

B&W Designer Tile

 

Mail to:

213 S 184th E. Ave

Tulsa, Ok. 74108

Hours of Operation:

Mon - Sat: 7am - 6pm

Sun: Closed

  • Facebook B&W Designer Tile
  • Pinterest Social Icon
  • Instagram Social Icon
  • Google Places Social Icon
  • YouTube Social  Icon
  • Twitter Social Icon bwtile
  • LinkedIn Social Icon

Copyright © 2018 B&W Designer Tile. All Rights Reserved.

                                                 SITEMAP